- Thread starter
- #221
jcool09
New Member
Hydro update
Well here's the new system. System is working as designed pumping solution from bottom bin into netcups in top bin then draining back to bottom. I had to replace the 1/4" PVC with tubing used for air pumps b/c the PVC was not flexible enough. The last thing I would need is for one of the lines to come out of the netcup and hose the inside of my cabinet down. I will run the lines through the rear of the shelf once I am confident that there are no leaks
Hydro Top
Hydro side
Clones Days 4 (UNK1,2) & 5(CAR2) - 10/27/09
UNK2 - Day 24 - 10/27/09
CAR1 - Day 36 - 10/27/09
CAR2 - Day 26 - 10/27/09
UNK1 - Day 25 - 10/27/09
Well here's the new system. System is working as designed pumping solution from bottom bin into netcups in top bin then draining back to bottom. I had to replace the 1/4" PVC with tubing used for air pumps b/c the PVC was not flexible enough. The last thing I would need is for one of the lines to come out of the netcup and hose the inside of my cabinet down. I will run the lines through the rear of the shelf once I am confident that there are no leaks
Hydro Top
Hydro side
Clones Days 4 (UNK1,2) & 5(CAR2) - 10/27/09
UNK2 - Day 24 - 10/27/09
CAR1 - Day 36 - 10/27/09
CAR2 - Day 26 - 10/27/09
UNK1 - Day 25 - 10/27/09