- Thread starter
- #41
Progress is coming along with the GH, I have the 2 long walls and the front wall completed, I would have gotten the back wall up but I ran out of ferring strips, I’m still waiting on the stupid special order ridge vent to come in to be able to do the roof, I may end up going with a traditional ridge vent and using expansion foam to seal the gaps like I’m going to do everywhere else