wildjim
Well-Known Member
I've been looking at the Recirculation Schedule
Feedcharts
although if im draining and refilling I should be using the to waste schedule till its more stable.
You plan on changing the nutrients on a regular schedule right? That would be Drain to waste. Ebb and Flow would be more like recirculating system. Your system is more like a DWC except for the drip ring and one large reservoir and each bucket has a smaller reservoir. As I understand it.
WJ